top of page

WHAT DOES ECOtherm PCM DO?

Our company helps your building become vastly more energy-efficient and cost-effective.

ECOtherm PCM provides a suite of energy products and services to enhance and support the installation of our proprietary Phase Change Material assets in new and existing buildings.

ECOtherm PCM is the highest-performing PCM retrofit product ever introduced to North America.

Installed inside the building envelope, our proprietary solutions are engineered and designed to yield maximum energy savings using our proprietary technology, products and installation systems.

After an initial free consultation, we will do a thorough evaluation of your property then create an energy-saving plan specifically designed for your building.

Our proprietary PCM products install above ceilings to cool air returning to the A/C system as heat is absorbed.

Every installation will optimize the thermal energy management in each particular situation by harnessing and storing energy in the PCM, then discharging any unused thermal energy overnight, using “free economizer cooling,” or by reduced-rate, conditioned air.

Each ECOtherm PCM™ job is project-specific; engineered then installed specifically for a new or existing HVAC system in your multi-story, single-story or residential building.

This saves a building owner money by greatly reducing consumption of energy and energy costs, while making buildings more efficient and sustainable.

ECOtherm PCM™ products have an aggressive payback.

ECOtherm PCM Energy Support Services

The cost of operating and maintaining buildings today is constantly increasing which erodes profits, reducing maintenance reserves and your building’s value.

When you contract with us, we provide a comprehensive array of additional energy services to enhance and support the installation of ECOtherm PCM products in new and existing buildings.

Here is what you get for FREE when you sign up for an ECOtherm PCM™ installation:

NEW PROJECTS

  • Building assessment

  • Project qualification/audit

  • Walk-through of facility and equipment

  • Building use/hours survey

  • Review of historical energy costs

  • Energy Star evaluation

  • Preliminary estimate of savings and simple payback from ECOtherm PCM™

QUALIFIED PROJECTS

  • Engineering

  • Building modeling

  • Investment-grade energy audit

  • Detailed energy savings and simple payback

  • Measurement and verification/monitoring

  • Utility incentive calculation and documentation

RETRO COMMISSIONING

  • Commissioning (optional)

  • Test and balance

  • Key points

  • Low risk

  • Engineered solution

  • Validated savings

  • Incentives are available for ECOtherm PCM™ products and engineering fees for qualified projects
  • Building modeling and technical analysis

  • Use with existing building automation systems

  • Measurable savings
  • Retro-commissioning

  • 179D Federal Tax Deductions through Cost Segregation

Contact us with questions or for a free consultation.

Thank you for connecting!

bottom of page